October Dome

October Dome, BC 

The October Dome gold-copper property is in central BC, near the town of Likely. The October Dome property is located 10 km north of Imperial Metals Corporation’s (“Imperial”) Mount Polley porphyry copper gold mine property and 7 km to the southeast of Osisko Development Ltd.’s QR skarn gold mine property. Historical work by previous operators has encountered diorite and monzonite intrusions within hornfelsed sediments and propylitized basalts with anomalous copper and gold values (unverified) that identifies two areas of alteration indicating an alkalic-style porphyry copper-gold system geologically similar to the nearby My Polley deposits.  Hole OD-6 encountered a 15-metre core length of massive magnetite skarn with semi-massive pyrite layers accompanied by chalcopyrite, epidote and garnet at the sediment/basalt contact.

Since 2018, Commander completed magnetic surveys, data compilation, magnetic susceptibility measurements of historical core soil sampling, airborne magnetic surveys, MT surveys (ELF) and geophysical modeling along with geological mapping. Key targets on the property are gold-bearing magnetite skarns associated with alkalic-style porphyry copper-gold systems and alkalic-style porphyry copper gold deposits akin to Mt Polley. (Data Verification Statement below)

Image
Image

Data Verification Statement

Mineral exploration data collected on the October Dome property has been compiled from a variety of sources and previous operators covering a period of 37 years.  Work was completed by Dome Exploration Canada Ltd, Valley High Ventures Ltd., Bearing Resources Ltd. (now Bearing Lithium), and Commander Resources.  Work programs (excluding that of Dome Exploration) and the data produced have been verified as accurate by Stephen Wetherup, (current CMD.V, VPX and QP) or by Rob Cameron (current CMD.V, President).  Robert Cameron was also the qualified person for Valley High Ventures and Bearing Resources.  Wetherup and Cameron are “qualified persons” under NI43-101 Standards of Disclosure for Mineral Projects.

Historical drill core from Dome Exploration activities is not available and the Company is treating this data as valid for exploration purposes, but not compliant with NI43-101 Standards of Disclosure for use in future resource estimates.  These drill collars have been re-located and surveyed and in addition were observed at the time by Robert Cameron during the original work program.

See news dated November 24, 2011, November 7, 2012, December 3, 2013 (under Bearing Lithium) posted on SEDAR for detailed technical disclosure.

Enduro Metals Corporation
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.